FMECA-Led Maintenance Risk Reduction Case StudyPort Terminal Operation - NSW, Australia

Key Outcomes
- 31 maintainable item groups
- 152 credible failure modes identified
- 18 potential fumigant release or leakage scenarios
- 140 preventive maintenance strategies
- Five corrective strategies
- Three regulatory strategies
- One condition-monitoring strategy
The Challenge
A port operation used phosphine gas within its fumigation plant. Due to the severe health and safety consequences of exposure, phosphine emissions are subject to strict licence conditions and can result in significant regulatory penalties.
Following an uncontrolled emission, the EPA investigated and found that the failure mode responsible for the release was completely absent from the operation’s maintenance strategies. The plant was being maintained using legacy plans that had not been developed through a structured, reliability-based process.
The incident raised a broader concern: if this critical failure mode had been overlooked, other safety, environmental, regulatory and operational risks might also lack effective maintenance controls.
The Solution
The Maintenance Manager engaged EnterpriseIS to facilitate a comprehensive FMECA across the entire fumigation plant. Maintenance personnel and selected operators contributed their technical knowledge and operating experience.
Using the EnterpriseIS methodology, the team reviewed each system, maintainable item and component to identify credible failure modes, their causes and consequences. Each failure mode was assessed for severity, likelihood and detectability, then prioritised using a Risk Priority Number.
The analysis covered 31 maintainable item groups and identified 152 credible failure modes, including 18 scenarios involving the potential release or leakage of fumigant to atmosphere. Appropriate controls were developed, including preventive maintenance, functional testing, calibration, condition monitoring, corrective maintenance and regulatory activities.
The Results
The FMECA confirmed the emission-related failure mode and identified numerous additional failure modes that were absent from, or inadequately covered by, the legacy maintenance plans.
The analysis produced 140 preventive maintenance strategies, five corrective strategies, three regulatory strategies and one condition-monitoring strategy. These included inspections, functional tests, calibration, pressure testing, vibration monitoring and preventive replacement activities.
The FMECA outcome was a significant reduction in the overall risk profile for the operation.
Related Content
- Blog – Mastering Preventive Maintenance: A 5-Step Guide to Operational Excellence
- Blog –The 7 Benefits of Preventive Maintenance: Insights from ISO 55000
- Blog – FMECA process – Preventing unplanned failure
- Blog – Understanding FMECA: A Comprehensive Guide to Failure Modes, Effects, and Criticality Analysis
- Case Study – Reliability Block Modelling
- Case Study Collection – Reliability Engineering